Project Overview
Opus Construction appointed our team to deliver a comprehensive access road and Section 278 highways works package in Kesgrave, supporting a wider development scheme. The project required close coordination with local authorities, strict adherence to highways standards, and careful traffic and safety management throughout the works.
The objective was to create a safe, durable, and fully compliant access route that integrated seamlessly with the existing highway network while minimising disruption to road users and local residents.
Scope of Works
The project scope covered all elements associated with new highway infrastructure and Section 278 obligations, including:
Construction of a new access road
Section 278 works to the existing public highway
Kerbing, drainage, and road construction layers
Footways and pedestrian access improvements
Service coordination and utility protection
Traffic management and temporary works
Compliance inspections and approvals
All works were delivered in line with local authority specifications and current highways regulations.
Challenges
Key challenges on this project included:
Working on and adjacent to a live public highway
Maintaining traffic flow and pedestrian safety
Coordinating approvals and inspections with the highways authority
Ensuring programme certainty while managing external constraints
Careful planning and proactive communication were essential to keep the project running smoothly.
Our Approach
From the outset, we worked collaboratively with Opus Construction, local stakeholders, and the highways authority to ensure a well-coordinated delivery strategy.
Our approach included:
Early engagement with highways officers to streamline approvals
Detailed traffic management planning to minimise disruption
Phased construction to maintain safe access at all times
High-quality materials and workmanship to ensure long-term durability
Regular progress updates and inspections to maintain compliance
Health and safety remained a top priority throughout, with robust site controls and clear signage implemented at every stage.
Outcome
The access road and Section 278 works were completed on programme and to specification, providing a high-quality highway interface that supports the ongoing development in Kesgrave.
The finished scheme delivers:
Safe and efficient vehicle access
Improved pedestrian connectivity
Full compliance with Section 278 requirements
A durable, future-proof highway solution
Opus Construction was provided with a fully approved and adoptable highway asset, contributing to the overall success of the development.
Client Feedback
Opus Construction valued the team’s professionalism, technical expertise, and proactive approach, particularly in managing highways approvals and live-road conditions.